{"id":9880,"date":"2026-11-09T04:50:08","date_gmt":"2026-11-09T04:50:08","guid":{"rendered":"https:\/\/cssun.net\/?p=9880"},"modified":"2026-11-09T04:50:11","modified_gmt":"2026-11-09T04:50:11","slug":"battery-site-information-checklist-before-delivery","status":"publish","type":"post","link":"https:\/\/cssun.net\/fr\/battery-site-information-checklist-before-delivery\/","title":{"rendered":"Before the Battery Arrives: A Site Information Checklist for Distributors and Installers"},"content":{"rendered":"<h1>Before the Battery Arrives: A Site Information Checklist for Distributors and Installers<\/h1>\n<p>By Leo | Sales Manager at CSSUN \u00b7 Battery &#038; Energy Storage Consultant<\/p>\n<p>A battery order can identify the correct product while leaving practical site questions unanswered. Before delivery, give the supplier and the local installer a shared record of the intended location, access route and installation responsibilities. The aim is to identify missing information before equipment reaches the site.<\/p>\n<p>This checklist is for collecting information. It is not an installation procedure, a wiring design or approval to energise equipment. The selected equipment manuals and the qualified local installer&#8217;s assessment remain the basis for installation.<\/p>\n<h2>1. Identify the equipment and the document version<\/h2>\n<p>Record the battery model, quantity and the version of the datasheet or manual used for the order. Add the associated inverter or charger model and the installer responsible for checking the complete system. Keep the agreed equipment list in the same folder as the site information.<\/p>\n<p>A catalogue screenshot is useful for starting a discussion, but the order should refer to identifiable products and applicable documents. If a label or manual differs from the order, raise the difference before work starts. For electrical matching, use our separate <a href=\"https:\/\/cssun.net\/fr\/rack-battery-inverter-compatibility-review-checklist\/\">rack-battery compatibility review checklist<\/a>.<\/p>\n<h2>2. Show the proposed location, not only the empty space<\/h2>\n<p>Take a wide photograph showing the proposed battery location and its surroundings. Add a simple sketch with measured dimensions and identify nearby equipment, doors and the route for future service access. Mark measurements that are estimated rather than confirmed.<\/p>\n<p>Ask the installer to compare the proposed location and mounting arrangement with the selected product instructions. Do not choose a universal clearance from a photograph of another installation. The same approach applies to support, permitted orientation and the space needed for the proposed equipment.<\/p>\n<p>For example, the <a href=\"https:\/\/www.victronenergy.com\/media\/pg\/Lithium_Battery_Smart\/en\/installation.html\" rel=\"nofollow noopener\" target=\"_blank\">Victron Lithium Smart installation manual<\/a> separately addresses handling, mounting and commissioning. Its detailed requirements apply to its own products; they are not CSSUN specifications. The useful procurement lesson is to request the corresponding instructions for the exact equipment being ordered.<\/p>\n<h2>3. Describe the environment and delivery access<\/h2>\n<p>Describe whether the location is inside a room, in a cabinet or exposed to weather. Report known temperature conditions at the proposed battery position and explain whether those figures are measured, estimated or still unknown. Include relevant exposure to sunlight, dust or water so that the installer can check suitability against the chosen model&#8217;s instructions.<\/p>\n<p>Document the route from the delivery point to the final location: door openings, stairs, lifts and any restrictions on moving equipment. Ask who will receive, inspect and position the goods. A clear responsibility list is more useful than assuming that transport to the building includes installation.<\/p>\n<h2>4. Agree what will be checked and recorded<\/h2>\n<p>Before delivery, agree who will compare the shipment with the order, record model and serial labels, and report any visible discrepancy. Ask the installer which documents and records are needed before installation and commissioning. Keep unresolved items visible, with a named person responsible for the next answer.<\/p>\n<p>Separate three milestones in the project record: goods received, installation completed, and commissioning accepted. A delivery signature alone should not be used as the project&#8217;s commissioning record. The acceptance criteria and the person authorised to approve each milestone should be agreed for the project.<\/p>\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/cssun.net\/wp-content\/uploads\/2026\/11\/cssun-battery-site-information-diagram.png\" alt=\"Four information groups for a battery site review: equipment identity, location and dimensions, environment and access, and project responsibilities.\" class=\"wp-image-9882\" width=\"1200\" height=\"900\" srcset=\"https:\/\/cssun.net\/wp-content\/uploads\/2026\/11\/cssun-battery-site-information-diagram.png 1200w, https:\/\/cssun.net\/wp-content\/uploads\/2026\/11\/cssun-battery-site-information-diagram-300x225.png 300w, https:\/\/cssun.net\/wp-content\/uploads\/2026\/11\/cssun-battery-site-information-diagram-1024x768.png 1024w, https:\/\/cssun.net\/wp-content\/uploads\/2026\/11\/cssun-battery-site-information-diagram-768x576.png 768w, https:\/\/cssun.net\/wp-content\/uploads\/2026\/11\/cssun-battery-site-information-diagram-16x12.png 16w\" sizes=\"(max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Conceptual information checklist. Refer to the selected equipment instructions for installation requirements.<\/figcaption><\/figure>\n<h2>Send one organised site-information pack<\/h2>\n<p>Use a short folder structure: equipment list and manuals; location photographs and measurements; access and environment notes; open questions and responsible contacts. Keep revisions dated so that the supplier and installer are discussing the same information.<\/p>\n<p>For a CSSUN enquiry, use our <a href=\"https:\/\/cssun.net\/fr\/contact-us\/\">contact page<\/a> to share the proposed battery model and quantity, and ask how to provide the site-information pack. We can use it to discuss product documentation and outstanding requirements. Site installation and acceptance arrangements should be confirmed with the responsible local professionals.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>Can a photo confirm that a location is suitable?<\/h3>\n<p>No. A photo helps identify questions, but measurements, relevant site conditions and the selected equipment requirements still need review by the installer.<\/p>\n<h3>Which clearance should I leave around the battery?<\/h3>\n<p>Use the requirements for the exact battery and associated equipment, reviewed for the proposed site. This article intentionally gives no universal clearance.<\/p>\n<h3>Do I need to provide private customer information?<\/h3>\n<p>Provide only the project information needed for the review. Remove passwords and unrelated personal information from photographs and documents before sharing them.<\/p>\n<h3>Does delivery acceptance mean the system is ready to operate?<\/h3>\n<p>No. Record delivery, installation and commissioning as separate milestones, with the agreed checks and responsible people identified.<\/p>\n<h3>What if the site details change after ordering?<\/h3>\n<p>Send the revised drawings or photographs, identify what changed and ask the supplier and installer to review any effect on the agreed equipment and installation plan before proceeding.<\/p>","protected":false},"excerpt":{"rendered":"<p>Before delivery, give your supplier and installer a shared record of the battery location, access route and project responsibilities.<\/p>","protected":false},"author":123457,"featured_media":9881,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-9880","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/posts\/9880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/users\/123457"}],"replies":[{"embeddable":true,"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/comments?post=9880"}],"version-history":[{"count":1,"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/posts\/9880\/revisions"}],"predecessor-version":[{"id":9883,"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/posts\/9880\/revisions\/9883"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/media\/9881"}],"wp:attachment":[{"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/media?parent=9880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/categories?post=9880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cssun.net\/fr\/wp-json\/wp\/v2\/tags?post=9880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}